The project scope involves improvements but are not limited to the following major elements: Installation of a truck offloading station and modifications to an existing utility, installation of a FC storage facility inside of existing Primary Sedimentation Tank 4 (PST 4, installation of CPVC piping to convey FC from truck to tanks, tanks to existing chemical feed pumps, to two injection points: the Mixed Sludge lines and the Primary Influent Channel. Installation of a chemical drainage piping system connected to the existing drain system for PST4 and the truck offloading station. Installation of tank level reading instruments, high-high floats and alarm beacons, area lights, emergency shower and eyewash stations, and remote operated motor-controlled valves at inlet and outlet of each tank.