Sierra Park Water Company Water System Improvements

Sierra Village, CA

Civil Estimating: Estimating Team
Electrical Estimator: Jeff Brackenbury
Bid Due Date/Time: June 19, 2024 at 2PM
Engineer: Black Water Consulting Engineers

The Project includes the installation of an oxidation and filtration treatment system to eliminate iron and manganese from the groundwater sources. The installation will include a Manganese Dioxide-Package treatment system, backwash storage tanks, waste storage tank, emergency generator, a mechanical building, Well 5 and Well 6 improvements, along with implementing Supervisory Control and Data Acquisition (SCADA) for remote monitoring and automation of tank and well operations.

Items available to be subcontracted and/or purchased include but are not limited to concrete materials; aggregates; SWPPP design; site clearing & grubbing; excavation & off haul; pre-engineered metal building; painting & coating; chain link fencing & gates; pipeline & trenching; rebar; HVAC; electrical materials & equipment; and instrumentation & controls.

Plans and specifications are available for viewing at our office, through local builders’ exchanges, and online at Public Purchase. We have also made the information available through the ShareFile link below:

Plans, Specifications, and Addenda

We encourage bids from all subcontractors and suppliers, including those with DBE/WBE/MBE/SBE status. We are an equal-opportunity employer. We encourage contracting with a group of DBEs when a contract is too large for one firm to manage individually. We offer assistance with bonding, credit, and insurance. Subcontractors will be required to sign the Auburn Constructors Standard Subcontract Agreement, which includes the right for Auburn to require subcontractors to furnish a faithful performance and labor bond in a form and from a surety acceptable to Auburn in the amount of 100% of the subcontract price. Subcontractors will be required to comply with all subcontract insurance requirements. A copy of the Standard Subcontract Agreement is available on request. All potential subcontractors and suppliers must also comply with the “Build America Buy America” (BABA) Provisions of Public Law 117-58.