West Side Tanks and Pump Station Project
owner: City of Roseville
Construction of two 6.0 MG pre-stressed concrete water storage tanks; a new booster pump station including four 250 HP vertical turbine pumps housed in a CMU building; flow meter vault; plant piping; new standby diesel generator with fuel tank and load bank; sitework including sewer, storm drain and potable water tie-ins; electrical and instrumentation including variable frequency drives, reduced voltage soft starters, security equipment, and new transformer.