West Side Tanks and Pump Station Project

owner: City of Roseville

Construction of two 6.0 MG pre-stressed concrete water storage tanks; a new booster pump station including four 250 HP vertical turbine pumps housed in a CMU building; flow meter vault; plant piping; new standby diesel generator with fuel tank and load bank; sitework including sewer, storm drain and potable water tie-ins; electrical and instrumentation including variable frequency drives, reduced voltage soft starters, security equipment, and new transformer.

contract amount:
$24,885,734

contract milestones:
May 2020 - Commencement
August 2022 - Original Completion
May 2022 - Substantial Completion
March 2023 - Final Completion

location:
Roseville, CA

design engineer:
Waterworks Engineers