Turlock Pump Stations

Location:
Turlock, CA
Contract Amount:
$6,388,200
Completion:
2010
Owner:
City of Turlock
Engineer:
Carollo Engineers, Inc.
Description:
Construction of two 1 MG welded steel water storage tanks and two pump stations for potable water service. Each pump station included six 125 HP split case booster pumps, one 2,500 gallon surge tank and one 500KW stand-by generator.
Copyright © 2024 Auburn Constructors, LLC
Website by Web Design Company