Red Hawk Casino WWTP

Location:
Shingle Springs, CA
Contract Amount:
$16,186,400
Completion:
2008
Owner:
Shingle Springs Tribal Gaming Authority
Engineer:
HydroScience Engineers, Inc.
Description:
This design-build project consisted of a 300,000 GPD membrane bioreactor WWTP, including influent screening facility, MBR reinforced concrete structure, flow equalization/emergency storage structure, chlorine contact structure, effluent pump station, solids handling facility, laboratory/administration building complete with chemical feed storage and feed systems, odor control and all associated electrical and instrumentation/SCADA systems. Effluent disposal consisted of approximately 17 acres of subterranean leach fields nestled amongst the tribal residential properties. The project also consisted of a 1 MG Potable Water Storage Tank, 3 MG Recycled Water Storage Tank and associated Booster Pump Stations.
Copyright © 2024 Auburn Constructors, LLC
Website by Web Design Company