Bear River Pump Station

Location:
Olivehurst, CA
Contract Amount:
$10,786,400
Completion:
2005
Owner:
Reclamation District 784
Engineer:
HMH, Inc.
Description:
Construction of two reinforced concrete storm water pump stations with multiple 400+ HP pumping units, dual standby generators, reinforced concrete box culvert, multiple 30”+ fabricated steel discharge pipelines, mass site grading, electrical and instrumentation control systems.
Copyright © 2024 Auburn Constructors, LLC
Website by Web Design Company