Folsom WTP Caustic Soda System
Removal of existing, decommissioned steel tanks and associated piping, modifications to the existing tank containment wall, installation of new caustic feed tank and new caustic containment area, installation of new caustic feed pumps and caustic feed pipeline, removal of existing lime feed piping and abandoned aqua ammonia tank, miscellaneous civil sitework including AC pavement and concrete replacement associated with the Work, and associated electrical, instrumentation, and controls.
Bid Documents