Tanner Backwash Drying Beds Project
The Work consists of the construction of backwash drying beds, clearing and grubbing, earthwork and excavation for new structures. Yard piping, new backwash waste line, overflow line, drain lines, spray down water lines, and other utilities. Infiltration beds with half-dome infiltrators. Earthen overflow basin, including overflow basin infiltrator assembly, emergency spillway, and overflow infiltrators. Concrete drying beds with ramps and flow control structures. Infiltration bed diversion structure with slide gates. Miscellaneous metal work including grating, handrail, stairs, and weir devices. Overflow basin structure.
Bid Documents