SASD S149 Concrete Pad & Drainage System

The project scope includes the construction of a concrete pad at the existing S149 pump station that will house a chemical tank and feed system for odor control, and underground drainage connection line from concrete pad to the Mission Trunk sewage collection line.

Bid Documents

bid date:
7/15/2026 - 2PM

civil estimating:
Roger Gutierrez

electrical estimating:
Jeff Brackenbury

owner:
Sacramento Area Sewer District

engineer:
SASD

engineer's estimate:
$320,000

location:
Carmichael