Red Hawk Casino WWTP

Shingle Springs, CA
Contract Amount:
Shingle Springs Tribal Gaming Authority
HydroScience Engineers, Inc.
This design-build project consisted of a 300,000 GPD membrane bioreactor WWTP, including influent screening facility, MBR reinforced concrete structure, flow equalization/emergency storage structure, chlorine contact structure, effluent pump station, solids handling facility, laboratory/administration building complete with chemical feed storage and feed systems, odor control and all associated electrical and instrumentation/SCADA systems. Effluent disposal consisted of approximately 17 acres of subterranean leach fields nestled amongst the tribal residential properties. The project also consisted of a 1 MG Potable Water Storage Tank, 3 MG Recycled Water Storage Tank and associated Booster Pump Stations.
Copyright © 2011 Auburn Constructors, Inc.
Website by Web Design Company