Hood Storage Tank & Water Treatment Plant

Sacramento County, CA

Bid Time: January 24, 2019 at 2PM
Estimator: John West
Electrical Estimator: Barry Evans
Engineer: SCWA
Engineer’s Estimate: $3,514,000

In general, the work to be performed under this contract includes the furnishing of all labor, materials, professional services, and equipment for the construction of a new groundwater treatment plant and an on-site well. Proposed facilities include: 100,000 gallon water storage tank; treated water pump station; surge tank; manufacturer supplied pressure filter treatment system including 5,300 gallon backwash storage tank, reclaim and backwash pumps; sodium hypochlorite feed system. Also building; fluoride treatment system; piping system; site grading and paving; landscaping; equipping the on-site well with pump, valves and piping; site piping; electrical system; instrumentation and controls; and other work, equipment, and facilities as required for a working water treatment plant. The work shall be accomplished within the project boundaries as shown or described on the Contract Drawings.

Plans and Specifications are available for viewing at our office, and on local builders’ exchanges. We have also made the information available on a Sharefile site.

Sharefile link:
Hood Storage Tank & WTP Bid Docs

Copyright © 2011 Auburn Constructors, Inc.
Website by Web Design Company