Winters Wastewater Treatment Facility (WWTF) Screening Improvements Phase II – Electrical Only

Winters, CA

Electrical Estimator: Jeff Brackenbury
Bid Due Date/Time: August 31, 2021
Engineer’s Estimate: <$1M
Engineer: WestYost

The work includes: the construction of an in-channel grinder, in-channel spiral screen, and effluent weir plates; plumbing; the installation of pumps, a master flow meter, and operational control panels; electrical work; modifications to the Master Control Center; the installation of a new Programmable Logic Controller; and the installation of software to interface with an existing Supervisory Control and Data Acquisition system.

Items available to be subcontracted and/or material quotations for this project include the following: – Electrical Materials, Gear & Equipment – Integration –

Plans and specifications are available for viewing at our office and at local builders’ exchanges. We have also made the information available on a Sharefile site (please use the link below):

Plans, Specifications & Addenda

Copyright © 2022 Auburn Constructors, LLC
Website by Web Design Company