North Bay Regional Water Treatment Plant Ozone System Improvements

Fairfield, CA

Estimator: John West
Electrical Estimator: Jeff Brackenbury
Bid Time/Date: May 7, 2019 at 2PM
Engineer: West Yost Associates
Engineer’s Estimate: $3.3M

This Project includes, but is not limited to, furnishing and installing the following: new ozone generation equipment; cooling water equipment; ozone diffusion systems; ozone destruct equipment; piping, valving, and instrumentation; electrical equipment; and controls.

Plans and specifications are available for viewing at our office and at local builders’ exchanges. We have also made the information available on a Sharefile site (please use the link below):

Plans, Specifications and Addenda