Folsom WTP Pre-Treatment System Improvement Project

Folsom, CA

Estimator: John West
Elec. Estimator: Jeff Brackenbury
Bid Due Date/Time: October 9, 2020 at 10am
Engineer’s Estimate: $3,400,000
Engineer: Black & Veatch

The project is generally described as general site demolition as shown on the Contract Documents, installing new plate settlers, influent piping modifications, sluice gate improvements and structural modifications in Basin No.5, modifications to the existing Lamella tube setters in Actiflo Basins, and associated Electrical, Instrumentation and Controls modifications.

Items available to be subcontracted and/or material quotations for this project include the following: –Furnish concrete or concrete supply – Paintings and coatings – Electrical Materials/Equipment -Instrumentation & Controls – Pipe fittings, valves and appurtenances

Plans and specifications are available for viewing at our office and at local builders’ exchanges. We have also made the information available on a Sharefile site (please use the link below):

Plans, Specifications & Addenda