Glenn- Colusa Irrigation District Tuttle Check Replacement Project

Glenn County, CA

Estimator: Brian Couper
Elec. Estimator: Jeff Brackenbury
Bid Due Date/Time: October 9, 2020 at 2pm
Engineer’s Estimate: $1M
Engineer: Provost & Pritchard

The work consists of demolition of existing concrete structures and the construction of a new reinforced concrete water control (or check) structure, precast concrete field turnout structure, rough and fine canal grading, installation water control gates, miscellaneous fabricate metals, site electrical, concrete canal lining and rep rap cancel lining.

Items available to be subcontracted and/or material quotations for this project include the following: –Rebar – Concrete Supply – Precast Concrete – Shotcrete – Miscellaneous Metals – Electrical Materials/Equipment – Painting and Coating – Earthwork – Pipe & Fittings – Water Control Gates

Plans and specifications are available for viewing at our office and at local builders’ exchanges. We have also made the information available on a Sharefile site (please use the link below):

Plans, Specifications & Addenda

Copyright © 2020 Auburn Constructors, LLC
Website by Web Design Company