Sycamore and Foothill Reservoir Residual Control System Project

Pleasanton, CA

Estimator: John West
Elec. Estimator: Jeff Brackenbury
Bid Due Date/Time: January 29, 2021 at 2pm
Engineer’s Estimate: $1.2M
Engineer: Carollo Engineering

The project includes procurement and installation of residual control systems, electrical system modification/installation, installation of fencing and general site improvements, and installation of equipment an piping as shown in the drawings at the City’s sycamore and Foothill Reservoir Tank Sites. The Contractor is responsible for providing and installing all other items as shown in the Drawings. The project also includes reconstruction of existing facilities affected by the work and incidentals for a complete and usable facility.

Items available to be subcontracted and/or material quotations for this project include the following: – Precast – Sitework – Fences and Gates – Residual Control System – Pipe, Fittings & Valves – Electrical materials & Components. –

Plans and specifications are available for viewing at our office and at local builders’ exchanges. We have also made the information available on a Sharefile site (please use the link below):

Plans, Specifications & Addenda

Copyright © 2021 Auburn Constructors, LLC
Website by Web Design Company