City of Biggs Ph. 2 WWTP Improvements Project

Biggs, CA

Estimator: John West
Electrical Estimator: Barry Evans
Bid Time: March 5, 2019 at 2PM
Engineer: Bennett Engineering Services
Engineer’s Estimate: $5.7M

The work consists of: installation of an effluent pump station, chlorine disinfection, effluent piping with horizontal directions drill (HDD) crossing under Hamilton Slough, effluent discharge to ponds, earthwork including grading, storage ponds and berms, ditches, irrigation pump and piping, valves, tie-ins, tailwater capture and return piping, electrical services for new equipment, SCADA system, associated SCADA telemetry, assorted fencing and gates, access roads, and WWTP decommissioning of disinfection and effluent discharge facilities.

Plans and Specifications are available for viewing at our office, and on local builders’ exchanges. We have also made the information available on a Sharefile site.

Biggs Ph. 2 WWTP Improvements Project Plans and Specifications

Copyright © 2011 Auburn Constructors, Inc.
Website by Web Design Company