Linda County Water District Equalization and Sludge Storage Project

Marysville, CA

Estimator: John West
Bid Due Date/Time: October 07, 2021, at 2pm
Engineer: Kennedy/Jenks

The work to be performed under this contract included the furnishing of all labor, materials, and equipment for the construction of a new 8-million-gallon concrete-lined equalization (EQ) and sludge storage basin, relocation of an earthen drainage basin, 6” digested sludge, 16” decant, 18” raw sewage and 4” 3Water piping, a pipe penetration for future use and a realigned gravel access road. The new EQ and sludge storage basin will be located within the LCWD Wastewater Treatment Plant adjacent to the two existing sludge lagoons (Sludge Lagoon No. 1 and No. 2). The new basin will be bifurcated by a concrete berm with one decant structure located in the southern half of the basin. The project includes site grading, paving, drainage, piping and other work as shown in the Drawings and described in the Contact Documents.

Items available to be subcontracted and/or material quotations for this project include the following: Sitework – Fences and Gates – Pipe, Fittings, & Vales – Concrete – Rebar – LLDPE Liner – Miscellaneous Metals – High Performance Coatings – Slide Gates and Flap Gates – 

Plans and specifications are available for viewing at our office and at local builders’ exchanges. We have also made the information available on a Sharefile site (please use the link below):

Plans, Specifications & Addenda

Copyright © 2021 Auburn Constructors, LLC
Website by Web Design Company