S070 Rio Del Oro Sewer Pump Station Project No. 1032068

Folsom, CA

Estimator: John West
Elec. Estimator: Jeff Brackenbury
Bid Due Date/Time: April 29, at 2:00pm
Engineer’s Estimate: $1.7M
Engineer: Wood Rogers, Inc.

The work generally includes finishing all labor, materials and equipment to reconstruct a Sacramento Are Sewer District sewer pump station. The work requires setting up and maintaining temporary flow bypass pumps, including a backup bypass pump, from the pump station intake to the existing force mains at the discharge end of the pump station. The bypass will include a monitoring system for remote monitoring and alerts of high-water conditions. The work further includes demolition of existing infrastructure, grading, construction of concrete vaults, manhole, piping, fencing and paving plus purchase and installation of a pumps, electrical system, and instrumentation as shown on the project plants.

Items available to be subcontracted and/or material quotations for this project include the following: – Submersible Centrifugal Pumps – Demolition – AC Paving – Precast – Bypass Pumping – Misc. Metal Fabrications – Pipe, Fittings, & Valves – Pipe Supports – Electrical Materials, Gear & Hardware – Instrumentation –

Plans and specifications are available for viewing at our office and at local builders’ exchanges. We have also made the information available on a Sharefile site (please use the link below):

Plans, Specifications & Addenda

Copyright © 2021 Auburn Constructors, LLC
Website by Web Design Company