Engineer’s Estimate: $31M
Engineer: Stantec

The project generally consists of demolition of the sidewall of an earthen basin (clearwell), raising of the levee of a wet weather holding basin, construction of two 3-million-gallon above ground recycled water storage tanks, an electrical substation, a motor control center, rehabilitation of pump stations, and rehabilitation of chemical injection systems.

Items available to be subcontracted and/or material quotations for this project include the following: -Demolition -Concrete Supply -Concrete Reinforcing Steel -Masonry -Miscellaneous & Structural Metalwork -Metal Decking -Railings -Insulations -Doors, Frames and Hardware -Gypsum Board -Paints, Coatings & Protective Coating -Pre-Engineered Metal Canopies & Buildings -Plumbing -HVAC -Electrical Materials/Equipment -Instrumentation & Controls -Earthwork -Dewatering -AC Paving -Fence & Gates – Precast Concrete -Pipe, Fittings, Valves & Appurtenances -Pipe Supports & Hangers -Horizontal Screw Centrifugal Pumps -Vertical Turbine Pumps -Submersible Pumps -Chemical Metering Pumps -Plastic Block Filter Underdrains -Filter Media -Filter Surface Washers

Plans and specifications are available for viewing at our office and at local builders’ exchanges. We have also made the information available on a Sharefile site (please use the link below):

Plans, Specifications & Addenda

Copyright © 2020 Auburn Constructors, LLC
Website by Web Design Company