Auburn Jail Generator Replacement

Auburn, CA

Estimator: John West
Electrical Estimator: Jeff Brackenbury
Bid Time/Date: May 30, 2019 at 11AM
Engineer: MFDB Architects
Engineer’s Estimate: $665K

The work consists generally of demolishing portions of the existing site and electrical, installing a concrete pad, furnishing and installing a new packaged engine generator system, and other related work.

Plans and specifications are available for viewing at our office and at local builders’ exchanges. We have also made the information available on a Sharefile site (please use the link below):