Allison Parkway Lift Station Expansion Project

Vacaville, CA

Estimator: John West
Electrical Estimator: Jeff Brackenbury
Bid Date/Time: July 2, 2019 at 2PM
Engineer: West Yost Associates
Engineer’s Estimate: $2.5M

The general description of work includes the construction of a new submersible sewage lift station, complete and ready for use. The lift station consists of a cast in place concrete wet well, valve vault and meter pit; odor control system with foul air blower and bioretention media vault; slab on grade masonry control building with stand-by generator, electrical instrumentation and controls; grading, paving and landscaping; piping and valves; and miscellaneous work required for a complete and operational facility. There is an existing lift station in place at the site which must remain operational until the new lift station is accepted by the City

Items available to be subcontracted and/or materials quotations for this project include the following:
-Surveying -Earthwork/Grading -Paving -Landscape & Irrigation -Dewatering -Gates -Concrete Supply -Rebar -Masonry -Precast Pipe/MHs -Metals -Insulation -Rough Carpentry -Wood Trusses -Roofing -Doors & Hardware -Overhead Doors -Stucco -HVAC -Paints & Coatings -Fire Protection -Stainless Steel Sluice Gates -Biofilter -Submersible Wastewater Pumps -Electrical Materials/Equipment -Integration & Control Equipment -Pipeline Installation -Pipe & Valve Supply -Building Plumbing -Engine Generator

Plans and specifications are available for viewing at our office and at local builders’ exchanges. We have also made the information available on a Sharefile site (please use the link below):

Plans, Specifications & Addenda

Copyright © 2011 Auburn Constructors, Inc.
Website by Web Design Company